Water
Fall Model VS Extreme Programming (XP)
Water
Fall Model
·
In water
fall model we gather the requirements from the Costumer.
·
Water fall
model is simple and obedient to use.
·
In water
fall model the requirements are read and then develop.
·
Feedback
is needed from costumer for accept a phase.
·
After
checking the Software published.
Extreme Programming (XP
·
In XP we
collect requirements from the costumer as Sorties.
·
In XP use
KIS (Keep It Simple).
·
In XP the
project is divided into iterations.
·
The Costumer
always available.
·
All code test.
After pass full tests it is published.
Iterative Model
VS SCRUM
Iterative
Model
·
Using this
model we can develop effective project.
·
Using this
model we can build and develop project progressive.
·
User Feedback
is compulsory how project will play task.
·
Using this
model short time for document creating and more time for developing.
·
We can
setup rough design and in emphasis we can better our project.
Scrum
·
Using
scrum we can design high-level design because meeting are held daily. For
Problem Desiccation.
·
Worker Group
decides what they can do to delivering about project.
·
Team
Master befriend with the project owner.
·
Time for
ready of documents is 1 hour and meeting is 4 hours.
·
Daily
Meeting is 15 minutes what we do today? Any Problem in Project?
Incremental model VS
Feature-Driven Development
Incremental Model
Uncomplicated to test in every condition and debug
during a smaller step. In this model customer can see and behave to each built.
·
Starting with
small, work subsystem, later releases add new performance.
·
This model
is soft and limited costly to change capacity and problems are easy to change.
·
Do working
rapidly and fresh as the same time as the program life cycle.
Feature-Driven Development
·
Five basic
activities, an all model, the building of a factor list, the planning by
factor, the designing by factor, and the building by factor.
·
Feature
driven development was also built as domain object modeling, developing by
factor and code ownership.
·
If it will
take two or more than two weeks, then it will have to be broken down into
smaller factors and working on it.
·
Feature
driven development main plan is to pass physical, working software many times
in a timely way.